Loading evidence directory
Loading evidence directory
NT · ALICE SPRINGS hospital
Recorded at this place
No defensible facility total yet. Published project costs remain visible below, but their boundaries or price bases do not currently support addition.
How to read this total
A total is shown only when every included row is an accepted whole-project quantity, has a stated cost and reviewed price/basis profile, shares that profile, has no open evidence review, has a confirmed facility attribution, and is not joined to another row by an unresolved or non-additive relationship. Otherwise the project evidence remains visible without manufacturing a facility total.
The evidence
Each project is the unit of record: it has its own boundary, cost basis and sources. This page is a view over them, not a substitute for them.
| Project | Cost evidence | How it was attached here |
|---|---|---|
| Alice Springs Hospital Emergency DepartmentUnknown | Latest source observation$13.6mAudit Report No.45 2011-12; ISBN 0 642 81253 5; ISSN 1036-7632 · not canonicalNot included in a facility total: No accepted whole-project cost with a stated cost and price basis. | Hospital named in full in the project titleinferred, confidence 0.950 · on “ALICE SPRINGS HOSPITAL” |
| Alice Springs Hospital – hybrid operating theatreUnknown | Latest source observation$473k2025-26. Health table printed p.24; Health narrative p.8; Health · not canonical · seen in 4 editionsNot included in a facility total: No accepted whole-project cost with a stated cost and price basis. | Hospital named in full in the project titleinferred, confidence 0.950 · on “ALICE SPRINGS HOSPITAL” |
| Alice Springs Hospital – new ambulatory care centre (2026-27: Alice Springs ambulatory care centre – design)Unknown | Latest source observation$2.4m2026-27 (most recent). Department of Health capital works table · not canonical · seen in 4 editionsNot included in a facility total: No accepted whole-project cost with a stated cost and price basis. | Hospital named in full in the project titleinferred, confidence 0.950 · on “ALICE SPRINGS HOSPITAL” |
| Alice Springs Hospital – relocate substation above the flood levelUnknown | Latest source observation$188k2024-25. Health table printed pp.29-30; Health narrative pp.6-7 · not canonical · seen in 3 editionsNot included in a facility total: No accepted whole-project cost with a stated cost and price basis. | Hospital named in full in the project titleinferred, confidence 0.950 · on “ALICE SPRINGS HOSPITAL” |
| Alice Springs Hospital – wet fire system replacementUnknown | Latest source observation$244k2023-24. Health table printed p.18 · not canonicalNot included in a facility total: No accepted whole-project cost with a stated cost and price basis. | Hospital named in full in the project titleinferred, confidence 0.950 · on “ALICE SPRINGS HOSPITAL” |
How these projects were attached to this hospital
Australian sources rarely state which facility a capital project belongs to. 5 of 5 links here were inferred by matching names, and each project row shows the method and confidence.