No defensible facility total yet. Published project costs remain visible below, but their boundaries or price bases do not currently support addition.
How to read this total
A total is shown only when every included row is an accepted whole-project quantity, has a stated cost and reviewed price/basis profile, shares that profile, has no open evidence review, has a confirmed facility attribution, and is not joined to another row by an unresolved or non-additive relationship. Otherwise the project evidence remains visible without manufacturing a facility total.
The evidence
Each project is the unit of record: it has its own boundary, cost basis and sources. This page is a view over them, not a substitute for them.
| Project | Cost evidence | How it was attached here |
|---|---|---|
| Building a better hospital for Melbourne's inner west (Footscray)Unknown | Latest source observation$2bn2026-27 · not canonical · seen in 2 editionsNot included in a facility total: No accepted whole-project cost with a stated cost and price basis. | Hospital name and suburb both matchedinferred, confidence 0.850 · on “footscray + FOOTSCRAY” |
| Forensic mental health implementation plan – priority service reforms (Footscray)Completed | Latest source observation$5.9m2020-21 · not canonical · seen in 2 editionsNot included in a facility total: No accepted whole-project cost with a stated cost and price basis. | Hospital name and suburb both matchedinferred, confidence 0.850 · on “footscray + FOOTSCRAY” |
| The New Footscray Hospital – planning and critical infrastructure (Footscray)Completed | Latest source observation$12.9m2023-24 · not canonicalNot included in a facility total: No accepted whole-project cost with a stated cost and price basis. | Hospital named in full in the project titleinferred, confidence 0.950 · on “FOOTSCRAY HOSPITAL” |
| The new Footscray Hospital (Footscray)Unknown | Latest source observation$50m2017-18 · not canonicalNot included in a facility total: No accepted whole-project cost with a stated cost and price basis. | Hospital named in full in the project titleinferred, confidence 0.950 · on “FOOTSCRAY HOSPITAL” |
| Western Health Urgent Infrastructure Works (Footscray and Sunshine)Unknown | Latest source observation$61.3m2017-18 · not canonical · seen in 2 editionsNot included in a facility total: No accepted whole-project cost with a stated cost and price basis. | Hospital name and suburb both matchedinferred, confidence 0.850 · on “footscray + FOOTSCRAY” |
| Western Region Health Centre – Dental Service Redevelopment (Footscray)Unknown | Latest source observation$9.7m2016-17 · not canonicalNot included in a facility total: No accepted whole-project cost with a stated cost and price basis. | Hospital name and suburb both matchedinferred, confidence 0.850 · on “footscray + FOOTSCRAY” |
How these projects were attached to this hospital
Australian sources rarely state which facility a capital project belongs to. 6 of 6 links here were inferred by matching names, and each project row shows the method and confidence.