NSW · RANDWICK hospital
Recorded at this place
No defensible facility total yet. Published project costs remain visible below, but their boundaries or price bases do not currently support addition.
How to read this total
A total is shown only when every included row is an accepted whole-project quantity, has a stated cost and reviewed price/basis profile, shares that profile, has no open evidence review, has a confirmed facility attribution, and is not joined to another row by an unresolved or non-additive relationship. Otherwise the project evidence remains visible without manufacturing a facility total.
The evidence
Each project is the unit of record: it has its own boundary, cost basis and sources. This page is a view over them, not a substitute for them.
| Project | Cost evidence | How it was attached here |
|---|---|---|
| Integrated Acute Services Building, Prince of Wales HospitalUnknown | Latest source observation$100m2024-25 · not canonicalNot included in a facility total: No accepted whole-project cost with a stated cost and price basis. | Hospital named in full in the project titleinferred, confidence 0.950 · on “PRINCE OF WALES HOSPITAL” |
| Prince of Wales Hospital - Addition to approved Acute Services BuildingUnknown | Latest source observation$66.7mcurrent · not canonicalNot included in a facility total: No accepted whole-project cost with a stated cost and price basis. | Hospital named in full in the project titleinferred, confidence 0.950 · on “PRINCE OF WALES HOSPITAL” |
| Prince of Wales Hospital - Cancer Care and Blood Disorder Centre (Stages 1 and 2)Unknown | Latest source observation$73.1mcurrent · not canonicalNot included in a facility total: No accepted whole-project cost with a stated cost and price basis. | Hospital named in full in the project titleinferred, confidence 0.950 · on “PRINCE OF WALES HOSPITAL” |
| Prince of Wales Hospital Expansion Stage 1Unknown | Latest source observation$358.7mcurrent · not canonicalNot included in a facility total: No accepted whole-project cost with a stated cost and price basis. | Hospital named in full in the project titleinferred, confidence 0.950 · on “PRINCE OF WALES HOSPITAL” |
How these projects were attached to this hospital
Australian sources rarely state which facility a capital project belongs to. 4 of 4 links here were inferred by matching names, and each project row shows the method and confidence.