Loading evidence directory
Loading evidence directory
NSW · MOUNT WARRIGAL hospital
Recorded at this place
No defensible facility total yet. Published project costs remain visible below, but their boundaries or price bases do not currently support addition.
How to read this total
A total is shown only when every included row is an accepted whole-project quantity, has a stated cost and reviewed price/basis profile, shares that profile, has no open evidence review, has a confirmed facility attribution, and is not joined to another row by an unresolved or non-additive relationship. Otherwise the project evidence remains visible without manufacturing a facility total.
The evidence
Each project is the unit of record: it has its own boundary, cost basis and sources. This page is a view over them, not a substitute for them.
| Project | Cost evidence | How it was attached here |
|---|---|---|
| New Shellharbour Hospital and Integrated ServicesUnknown | Latest source observation$700mlive site · not canonicalNot included in a facility total: No accepted whole-project cost with a stated cost and price basis. | Hospital named in full in the project titleinferred, confidence 0.950 · on “SHELLHARBOUR HOSPITAL” |
| Shellharbour Hospital RedevelopmentUnknown | Latest source observation$250.6mPerformance audit, final report (website version), 45 pp · not canonicalNot included in a facility total: No accepted whole-project cost with a stated cost and price basis. | Hospital named in full in the project titleinferred, confidence 0.950 · on “SHELLHARBOUR HOSPITAL” |
| Shellharbour Hospital and Integrated Services (New)Unknown | Latest source observation$828.9m2026-27 · not canonical · seen in 2 editionsNot included in a facility total: No accepted whole-project cost with a stated cost and price basis. | Hospital named in full in the project titleinferred, confidence 0.950 · on “SHELLHARBOUR HOSPITAL” |
| New Shellharbour HospitalUnknown | Latest source observationNot reportedNot included in a facility total: No accepted whole-project cost with a stated cost and price basis. | Hospital named in full in the project titleinferred, confidence 0.950 · on “SHELLHARBOUR HOSPITAL” |
How these projects were attached to this hospital
Australian sources rarely state which facility a capital project belongs to. 4 of 4 links here were inferred by matching names, and each project row shows the method and confidence.