St John of God Berwick Hospital
Secondary 4
Reporting boundary
Extracted from Studio STH (Silver Thomas Hanley) — Projects index by automated document mining (DM-026). Not reviewed by a person.
Recorded particulars
What else the sources state
Capacity
- Beds
- 190 new beds introduced Document miningnew beds; future expansion capacity stated as 316 beds and 12 theatresSecondary
- Operating theatres
- 6 operating theatres Document miningexcludes 2 endoscopy theatres and 6 birthing suites listed separatelySecondary
Size
- Floor area
- 80,000m² Document miningSecondary
Timeline
- Completion date
- Completed 2018 Document miningSecondary
Sources
Original documents
Document mining, Studio STH (Silver Thomas Hanley) — Projects index
Project page, 'Status'
Open original sourceDocument mining, Studio STH (Silver Thomas Hanley) — Projects index
Project page, 'Size'
Open original sourceDocument mining, Studio STH (Silver Thomas Hanley) — Projects index
Project page, key figures
Open original source