No defensible facility total yet. Published project costs remain visible below, but their boundaries or price bases do not currently support addition.
How to read this total
A total is shown only when every included row is an accepted whole-project quantity, has a stated cost and reviewed price/basis profile, shares that profile, has no open evidence review, has a confirmed facility attribution, and is not joined to another row by an unresolved or non-additive relationship. Otherwise the project evidence remains visible without manufacturing a facility total.
The evidence
Each project is the unit of record: it has its own boundary, cost basis and sources. This page is a view over them, not a substitute for them.
| Project | Cost evidence | How it was attached here |
|---|---|---|
| Lifehouse at the Royal Prince Alfred Hospital (the new Sydney Cancer Centre)Unknown | Latest source observation$310mAudit Report No.45 2011-12; ISBN 0 642 81253 5; ISSN 1036-7632 · not canonicalNot included in a facility total: No accepted whole-project cost with a stated cost and price basis. | Hospital named in full in the project titleinferred, confidence 0.950 · on “ROYAL PRINCE ALFRED HOSPITAL” |
| Royal Prince Alfred Hospital RedevelopmentUnknown | Latest source observation$940m2026-27 · not canonical · seen in 3 editionsNot included in a facility total: No accepted whole-project cost with a stated cost and price basis. | Hospital named in full in the project titleinferred, confidence 0.950 · on “ROYAL PRINCE ALFRED HOSPITAL” |
How these projects were attached to this hospital
Australian sources rarely state which facility a capital project belongs to. 2 of 2 links here were inferred by matching names, and each project row shows the method and confidence.