Royal Darwin Hospital – upgrade forensic mortuary, pathology and bereavement facility
Machine-read 4
Reporting boundary
Approved as a NEW work in 2023-24 at 23 700 ($000), revoted at 22 573 in 2024-25, then absent from the 2025-26 and 2026-27 capital works tables. The 2026-27 edition instead approves two new smaller items (see the separate 'Royal Darwin Hospital – forensic morgue and bereavement centre / morgue upgrades' record). The source does NOT state that this project was cancelled, deferred or superseded; the disappearance is an observation, not a stated variance.
Project structure
How this record relates to other projects
Succeeded by
Royal Darwin Hospital forensic morgue and bereavement centre — designThe new design initiative follows the withdrawn older mortuary/pathology facility proposal.Source and location
Document mining
Northern Territory 2026-27 Budget, Budget Paper No. 4 – The Infrastructure Program
p.24, Department of Health table, 'Program $000' column, under 'New works in 2026-27' / Greater Darwin / Royal Darwin Hospital
Forensic morgue and bereavement centre – design 1 000
Open original source: Northern Territory 2026-27 Budget, Budget Paper No. 4 – The Infrastructure Program
Cost as published, edition by edition
What each edition said this would cost
3 observations
| Edition | Published figure | Publisher | Evidence |
|---|---|---|---|
| 2023-24. Health table printed p.18 | $23.7mAs printed: 23 700 ($'000)Capital meaning not yet reviewedInterpretation statusNot yet classified · Not stated | Document mining | Machine-read |
| 2024-25. Health table printed pp.29-30; Health narrative pp.6-7 | $22.6mAs printed: 22 573 ($'000)Capital meaning not yet reviewedInterpretation statusNot yet classified · Not stated | Document mining | Machine-read |
| 2024-25. Health table printed pp.29-30; Health narrative pp.6-7 | $22.6mAs printed: $22.6 millionCapital meaning not yet reviewedInterpretation statusNot yet classified · Not stated | Document mining | Machine-read |
Recorded particulars
What else the sources state
Schedule
- Construction start
- Q2, 2024 Document miningMachine-read
Sources
Original documents
Document mining, Northern Territory 2023-24 Budget, Budget Paper No. 4 – The Infrastructure Program
p.18, Department of Health table, 'Start date' column, under 'New works in 2023-24'
Open original sourceDocument mining, Northern Territory 2023-24 Budget, Budget Paper No. 4 – The Infrastructure Program
p.18, Department of Health table, 'Program $000' column, under 'New works in 2023-24' / Greater Darwin / Royal Darwin Hospital
Open original sourceDocument mining, Northern Territory 2024-25 Budget, Budget Paper No. 4 – The Infrastructure Program
p.29, Department of Health table, 'Program $000' column, under 'Revoted works from 2023-24' / Greater Darwin / Royal Darwin Hospital
Open original sourceDocument mining, Northern Territory 2024-25 Budget, Budget Paper No. 4 – The Infrastructure Program
p.7, Overview chapter, 'Health' section, 'Significant continuing works in 2024-25' bullet list
Open original source