Loading evidence directory
Loading evidence directory
NT · TIWI hospital
Recorded at this place
No defensible facility total yet. Published project costs remain visible below, but their boundaries or price bases do not currently support addition.
How to read this total
A total is shown only when every included row is an accepted whole-project quantity, has a stated cost and reviewed price/basis profile, shares that profile, has no open evidence review, has a confirmed facility attribution, and is not joined to another row by an unresolved or non-additive relationship. Otherwise the project evidence remains visible without manufacturing a facility total.
The evidence
Each project is the unit of record: it has its own boundary, cost basis and sources. This page is a view over them, not a substitute for them.
| Project | Cost evidence | How it was attached here |
|---|---|---|
| Royal Darwin Hospital - Short-term Patient AccommodationUnknown | Latest source observation$18.6mAudit Report No.45 2011-12; ISBN 0 642 81253 5; ISSN 1036-7632 · not canonicalNot included in a facility total: No accepted whole-project cost with a stated cost and price basis. | Hospital named in full in the project titleinferred, confidence 0.950 · on “ROYAL DARWIN HOSPITAL” |
| Royal Darwin Hospital existing morgue urgent upgradesUnknown | Latest source observation$2m2026-27 (most recent). Department of Health capital works table · not canonicalNot included in a facility total: No accepted whole-project cost with a stated cost and price basis. | Hospital named in full in the project titleinferred, confidence 0.950 · on “ROYAL DARWIN HOSPITAL” |
| Royal Darwin Hospital forensic morgue and bereavement centre — designUnknown | Latest source observation$1m2026-27 (most recent). Department of Health capital works table · not canonicalNot included in a facility total: No accepted whole-project cost with a stated cost and price basis. | Hospital named in full in the project titleinferred, confidence 0.950 · on “ROYAL DARWIN HOSPITAL” |
| Royal Darwin Hospital – additional clinical spacesUnknown | Latest source observation$24.8m2024-25. Health table printed pp.29-30; Health narrative pp.6-7 · not canonical · seen in 3 editionsNot included in a facility total: No accepted whole-project cost with a stated cost and price basis. | Hospital named in full in the project titleinferred, confidence 0.950 · on “ROYAL DARWIN HOSPITAL” |
| Royal Darwin Hospital – air-conditioning upgrades (including maternity ward)Unknown | Latest source observation$500k2026-27. Tennant Creek Hospital narrative p.22 (Barkly); Royal D · not canonicalNot included in a facility total: No accepted whole-project cost with a stated cost and price basis. | Hospital named in full in the project titleinferred, confidence 0.950 · on “ROYAL DARWIN HOSPITAL” |
| Royal Darwin Hospital – central sterilisation services department trolley washer and reverse osmosis systemUnknown | Latest source observation$598k2022-23 (oldest edition read). Health table printed p.20 · not canonicalNot included in a facility total: No accepted whole-project cost with a stated cost and price basis. | Hospital named in full in the project titleinferred, confidence 0.950 · on “ROYAL DARWIN HOSPITAL” |
| Royal Darwin Hospital – establish mental health stabilisation assessment and referral area unitUnknown | Latest source observation$6.6m2024-25. Health table printed pp.29-30; Health narrative pp.6-7 · not canonical · seen in 3 editionsNot included in a facility total: No accepted whole-project cost with a stated cost and price basis. | Hospital named in full in the project titleinferred, confidence 0.950 · on “ROYAL DARWIN HOSPITAL” |
| Royal Darwin Hospital – forensic morgue and bereavement centre (design) and morgue upgradesUnknown | Latest source observation$3m2026-27. Tennant Creek Hospital narrative p.22 (Barkly); Royal D · not canonicalNot included in a facility total: No accepted whole-project cost with a stated cost and price basis. | Hospital named in full in the project titleinferred, confidence 0.950 · on “ROYAL DARWIN HOSPITAL” |
| Royal Darwin Hospital – mental health inpatient unit (from 2025-26 titled: Mental health inpatient unit, and stabilisation assessment and referral area facility)Unknown | Latest source observation$2.3m2026-27 (most recent). Department of Health capital works table · not canonical · seen in 5 editionsNot included in a facility total: No accepted whole-project cost with a stated cost and price basis. | Hospital named in full in the project titleinferred, confidence 0.950 · on “ROYAL DARWIN HOSPITAL” |
| Royal Darwin Hospital – new modular multipurpose facility (32-bed multi-purpose modular ward)Unknown | Latest source observation$17.6m2025-26. Health table printed p.24; Health narrative p.8; Health · not canonical · seen in 3 editionsNot included in a facility total: No accepted whole-project cost with a stated cost and price basis. | Hospital named in full in the project titleinferred, confidence 0.950 · on “ROYAL DARWIN HOSPITAL” |
| Royal Darwin Hospital – remedial repairs to concrete spallingUnknown | Latest source observation$2.3m2024-25. Health table printed pp.29-30; Health narrative pp.6-7 · not canonical · seen in 3 editionsNot included in a facility total: No accepted whole-project cost with a stated cost and price basis. | Hospital named in full in the project titleinferred, confidence 0.950 · on “ROYAL DARWIN HOSPITAL” |
| Royal Darwin Hospital – replace fire indicator panelUnknown | Latest source observation$2.6m2026-27 (most recent). Department of Health capital works table · not canonical · seen in 4 editionsNot included in a facility total: No accepted whole-project cost with a stated cost and price basis. | Hospital named in full in the project titleinferred, confidence 0.950 · on “ROYAL DARWIN HOSPITAL” |
| Royal Darwin Hospital – upgrade forensic mortuary, pathology and bereavement facilityUnknown | Latest source observation$22.6m2024-25. Health table printed pp.29-30; Health narrative pp.6-7 · not canonical · seen in 2 editionsNot included in a facility total: No accepted whole-project cost with a stated cost and price basis. | Hospital named in full in the project titleinferred, confidence 0.950 · on “ROYAL DARWIN HOSPITAL” |
How these projects were attached to this hospital
Australian sources rarely state which facility a capital project belongs to. 13 of 13 links here were inferred by matching names, and each project row shows the method and confidence.