TAS · HOBART hospital
Recorded at this place
No defensible facility total yet. Published project costs remain visible below, but their boundaries or price bases do not currently support addition.
How to read this total
A total is shown only when every included row is an accepted whole-project quantity, has a stated cost and reviewed price/basis profile, shares that profile, has no open evidence review, has a confirmed facility attribution, and is not joined to another row by an unresolved or non-additive relationship. Otherwise the project evidence remains visible without manufacturing a facility total.
The evidence
Each project is the unit of record: it has its own boundary, cost basis and sources. This page is a view over them, not a substitute for them.
| Project | Cost evidence | How it was attached here |
|---|---|---|
| K-Block, Royal Hobart Hospital inpatient precinct (Stage 1 Phase 3)Unknown | Latest source observation$584mNo. 5 of 2019-20 · not canonical · seen in 2 editionsNot included in a facility total: No accepted whole-project cost with a stated cost and price basis. | Hospital named in full in the project titleinferred, confidence 0.950 · on “ROYAL HOBART HOSPITAL” |
| Royal Hobart Hospital - Cardiology AngiographyUnknown | Latest source observation$2.3m2025-26 · not canonical · seen in 2 editionsNot included in a facility total: No accepted whole-project cost with a stated cost and price basis. | Hospital named in full in the project titleinferred, confidence 0.950 · on “ROYAL HOBART HOSPITAL” |
| Royal Hobart Hospital - Diagnostic Breast ImagingUnknown | Latest source observation$15m2025-26 · not canonical · seen in 2 editionsNot included in a facility total: No accepted whole-project cost with a stated cost and price basis. | Hospital named in full in the project titleinferred, confidence 0.950 · on “ROYAL HOBART HOSPITAL” |
| Royal Hobart Hospital - New Angiography Suite and Equipment UpgradeUnknown | Latest source observation$7m2025-26 · not canonical · seen in 2 editionsNot included in a facility total: No accepted whole-project cost with a stated cost and price basis. | Hospital named in full in the project titleinferred, confidence 0.950 · on “ROYAL HOBART HOSPITAL” |
| Royal Hobart Hospital Integrated Cancer Centre (Stage 1 Phase 2)Unknown | Latest source observation$20mNo. 5 of 2019-20 · not canonical · seen in 2 editionsNot included in a facility total: No accepted whole-project cost with a stated cost and price basis. | Hospital named in full in the project titleinferred, confidence 0.950 · on “ROYAL HOBART HOSPITAL” |
| Royal Hobart Hospital Pharmacy RedevelopmentUnknown | Latest source observation$21.9m2026-27 · not canonical · seen in 4 editionsNot included in a facility total: No accepted whole-project cost with a stated cost and price basis. | Hospital named in full in the project titleinferred, confidence 0.950 · on “ROYAL HOBART HOSPITAL” |
| Royal Hobart Hospital Redevelopment (Stage 1 of the RHH site-wide Master Plan)Unknown | Latest source observation$469.2m2026-27 · not canonical · seen in 7 editionsNot included in a facility total: No accepted whole-project cost with a stated cost and price basis. | Hospital named in full in the project titleinferred, confidence 0.950 · on “ROYAL HOBART HOSPITAL” |
| Royal Hobart Hospital Redevelopment - Expanded Stage 2Unknown | Latest source observation$118.4m2026-27 · not canonical · seen in 3 editionsNot included in a facility total: No accepted whole-project cost with a stated cost and price basis. | Hospital named in full in the project titleinferred, confidence 0.950 · on “ROYAL HOBART HOSPITAL” |
| Royal Hobart Hospital Stage 2 RedevelopmentUnknown | Latest source observation$91.1m2022-23 Budget · not canonicalNot included in a facility total: No accepted whole-project cost with a stated cost and price basis. | Hospital named in full in the project titleinferred, confidence 0.950 · on “ROYAL HOBART HOSPITAL” |
| Stage 2 Menzies Building (Hobart)Unknown | Latest source observation$44.7mAudit Report No.45 2011-12; ISBN 0 642 81253 5; ISSN 1036-7632 · not canonicalNot included in a facility total: No accepted whole-project cost with a stated cost and price basis. | Hospital name and suburb both matchedinferred, confidence 0.850 · on “hobart + HOBART” |
How these projects were attached to this hospital
Australian sources rarely state which facility a capital project belongs to. 10 of 10 links here were inferred by matching names, and each project row shows the method and confidence.